Reconstruction of one span Of 35 Mt. length of 136 Years old Hope bridge along with both sides of approaches near village Pal at draft T.P.Scheme No.15(Pal) in Lake Garden, Surat.

01 Location : Draft T.P.15(Pal) Lake Garden, Surat.
02 River/ Nala/ Creek/ Lake : Lake
03 Lane : One
04 Year of Construction : Completed 2015
05 Cost : Rs.2,04,75,015=41 Paise
06 Details of Bridge :

 

  (i) Length of Bridge      
   (Between ends of Decking)
: 69.00 mt
  (ii) Number of Span : Three
  (iii) Span Length : 35.00 mt 1 span
17.00 mt. 2 span (Approach both side)
  (iv) Carriage Way : 4.50 mt(Pedestrian bridge)
  (V) Width of Bridge : 4.50 mt
  (v) Length of R.C.C.
     Approaches &Returns
: ----
07 (i)   Design Discharge : ---
  (ii)  Design H.F.L. : ----
  (iii) Type of Bridge : Pedestrian Bridge
  (iv) F.R.L. : 17.110 mt
08 Structural Details    
  (i) Foundation : 1200 mm dia, R.C.C. pile foundation
  (ii) Substructure : R.C.C.  pier/ pier cap
  (iii) Superstructure : Steel Truss
  (iv) General Items :  
09 Name of Contractor : Vijay M.Mistry Construction Pvt Ltd., Ahmadabad
10 Name of Design Consultant : Casad Consultant, Ahmadabad
11 Name of Project Management Consultant :

----