Construction of " Shri Chandra Sekhar Azad " bridge across River Tapi joining Rander area (Nr. Jilani complex) & Katargam area (Nr. Palia Kotar No.7) in Surat City

01 Location : Across River Tapi joining Rander area (Jilani complex) & Katargam area (Nr. Palia Kotar No.7)
02 River/ Nala/ Creek : River Bridge cum Fly Over
03 Lane : Four Lane (Two up + Two down)
04 Year of Construction : Under Progress
05 Cost : Rs. 19081.81 Lacs
06 Details of Bridge :  
  (i) Length of Bridge
(Between ends of Decking)
: 2784.76 mt.
  (ii) Number of Span : 77 Nos.
  (iii) Span Length : Max- 50 mt,Min. 25 mt.
  (iv) Carriage Way : 7.50 mt. (Up) + 7.50mt. (Down) in River
portion & Katargam Side.
(ii) 7.50 mt up & 7.50 mt.Down separate
Towards cause way
(iii) 11 mt.(3 lan Un divided) Towards Adajan circle.
  (v) Length of R.C.C.
Approaches &Returns
: Rander side - Cause way - Up Side -114.89 mt.
                                       D/S Side -115.52 mt.
                     Adajan side - 104.90mt.
Katargam Side - 129.28mt.
  (vi) Total Length of bridge (Including Approaches) : 2900.285 mt.
07 (i) Design Discharge : 12 Lacs cusecs
  (ii)  Design H.F.L. : 15.56 mt.
  (iii) Type of Bridge : High Level
  (iv) F.R.L. : 20.260 mt. in River Portion
08 Structural Details    
  (i) Foundation : Pile Foundation with various dia piles.
  (ii) Substructure : R.C.C. Wall Type Pier & Pier Cap in river portion & RCC circular piers in balance portion Cast in Situ.
  (iii) Superstructure : PSC � I Girder, with cons.in situ deck slab ,slab in river portion & Katargam side. PSC voided Slab on Jilani side outside bund.
  (iv) General Items : RCC wearing coat
RCC Retaining wall and RCC Box.
Return on pile foundation
09 Name of Contractor : Ranjit Buildcon Ltd., Ahmedabad
10 Name of Design Consultant : Technogem Consultants Pvt Ltd, Thane.
11 Name of Proof Checking Consultant : (I) IIT, Mumbai, Powai & Design (R & B) Circle, Gandhinagar
(II) R & B Design Circle, Gandhinagar
12 PMC : CASAD Consultants ,Ahmedabad.