Construction of " Shri Balgangadhar Tilak " Fly Over Bridge on Sosyo Circle junction on Udhna-Magdalla road, Surat. (UNDER SJMMSVY)

01 Location : Sosyo Circle on Udhana Magadalla Road
02 River/ Nala/ Creek : Fly Over Bridge
03 Lane : Three Lane Up & Three Lane Down
04 Year of Construction : June-2013
05 Cost : Rs. 24,84,33,128=88
06 Details of Bridge :  
  (i) Length of Bridge
(Between ends of Decking)
: 274.40mt. (Total 446.999 mt incl. approach)
  (ii) Number of Span : 2 X 16 = 32
  (iii) Span Length  : 2 X 9 X 12.5 = 225mt.
2 X 2 X 21.70 = 86.80mt.
2 X 2 X 28 = 112 mt.
2 X 2 X 18.75=75 mt
2 X 1 X 25=50 mt
For both Up & Down
  (iv) Carriage Way : 2 X 10.50mt. both Up & Down
Total width 23.20mt.
(Three Lane Up & Three Lane Down)
  (v) Length of R.C.C.
Approaches &Returns
: Towards Uhana = 92.873 Rmt.
Towards Magadalla =79.726 Rmt.
07 (i) Design Discharge : --------
  (ii)  Design H.F.L. : --------
  (iii) Type of Bridge : Fly Over Bridge
  (iv) F.R.L. : 15.527 mt
08 Structural Details    
  (i) Foundation : RCC Bored Cast in situ 1000mm dia 180 Nos. of pile, Pile Foundation
  (ii) Substructure : Rectangular Pier
  (iii) Superstructure : PSC RCC Solid Slab
  (iv) General Items : (1) Strip seal Expansion joint
(2) Elastomeric Bearing
09 Name of Contractor : Vijay M. Mistry Construction Pvt. Ltd., Ahmedabad.
10 Name of Design Consultant : (Formally Pankaj Patel & Associates, Ahmedabad.)
Pankaj M.Patel Consultants Pvt Ltd., Ahmedabad
11 Name of Project Management Consultant : Casad Consultant, Ahmedabad