Construction of bridge at Unn - Gabheni road joining Sanjarnagar & Jilaninagar, Surat

01 Location : On creek at Unn - Gabheni road joining Sanjar nagar & Jilani nagar
02 River/ Nala/ Creek : Creek bridge
03 Lane : two lane
04 Year of Construction : July-2010
05 Cost : 175 Lacs
06 Details of Bridge :  
07 (i) Length of Bridge       : 32.08 mt.
  (ii) Number of Span : 2 nos.
  (iii) Span Length : 16.04 mt.
  (iv) Carriage Way : 7.5 mt.
  (v) Length of Approaches & Returns : 76 mt.
08 (i)   Design Discharge : Not Available
  (ii)  Design H.F.L. : 6.855 mt.
  (iii) Type of Bridge : submersible
  (iv) F.R.L. : 7.0 mt.
09 Structural Details    
  (i) Foundation : 1000 mm dia. pile foundation
  (ii) Substructure : RCC pier and pier cap
  (iii) Superstructure : PSC solid slab
  (iv) General Items : ----
10 Name of Contractor : C. R. Patel, Surat.
11 Name of Design Consultant : Pankaj Patel & Associates, Ahmedabad