1.
|
Location
|
On U/s side of existing Tapi bridge of Amroli
|
2.
|
River/Nala/Creek
|
Tapi river
|
3.
|
Lane
|
Two
|
4.
|
Year of construction
|
July - 2010
|
5.
|
Tender Cost
|
Rs. 2405.32 Lacs
|
6.
|
Details of Bridge
|
|
(i) Length of Bridge between ends of decking
|
655.20 mt.
|
|
(ii) Number of span
|
15 nos.
|
|
(iii) Span Length
|
12 spans of 50.60 mt., 2 spans of 20.0 mt. & 1 span of 8.0 mt.
|
|
(iv) Carriage Way
|
7.5 mt. with 2.0 mt wide footpath on one side
|
|
(v) Length of R.C.C.
Approaches & Returns
|
(i) Katargam side - 91.59 mt.
|
|
|
(ii) Amroli side - 138.20 mt.
|
7.
|
(i)Design Discharge
|
12 lacs cusecs and foundation designed for 16 lacs cusecs
|
|
(ii) Design H.F.L.
|
R.L. 16.25 mt.
|
|
(iii) Type of bridge
|
High level Bridge
|
|
(iv) Finished Road top level
|
21.055 mt.
|
8.
|
Structural Details
|
|
(i) Foundation
|
1500 mm dia pile foundation
|
|
(ii) Substructure
|
R.C.C. Wall type solid piers
|
|
(iii) Superstructure
|
Pre-stressed "I" beam girder & Deck slab
|
|
(iv) General Items
|
POT-PTFE type bearing, Strip seal type Expansion joint & R.C.C. Retaining Wall
|
9.
|
Name of Contractor
|
Rajkamal Builders Infrastructure Pvt. Ltd., Ahmedabad.
|
10.
|
Name of Design Consultant
|
Stup Consultants Pvt. Ltd., Navi Mumbai
|
11.
|
Name of Project management consultant
|
S.N.Bhobe & Associates Pvt. Ltd,
Navi Mumbai.
|
12.
|
Name of Third Party Inspecting agency
|
Certifications Engineers International Ltd.,
Navi Mumbai.
|
13.
|
Name of Proof Consultant
|
Sardar Vallabhbhai National Institute of Technology, Surat.
|