Construction of "Pandit Shyamji Krishna Verma" high level bridge across river Tapi besides existing bridge at Amroli in Surat City

1. Location On U/s side of existing Tapi bridge of Amroli
2. River/Nala/Creek Tapi river
3. Lane Two
4. Year of construction July - 2010
5. Tender Cost Rs. 2405.32 Lacs
6. Details of Bridge
  (i) Length of Bridge between ends of decking 655.20 mt.
  (ii) Number of span 15 nos.
  (iii) Span Length 12 spans of 50.60 mt., 2 spans of 20.0 mt. & 1 span of 8.0 mt.
  (iv) Carriage Way 7.5 mt. with 2.0 mt wide footpath on one side
  (v) Length of R.C.C. Approaches & Returns (i) Katargam side - 91.59 mt.
    (ii) Amroli side - 138.20 mt.
7. (i)Design Discharge 12 lacs cusecs and foundation designed for 16 lacs cusecs
  (ii) Design H.F.L. R.L. 16.25 mt.
  (iii) Type of bridge High level Bridge
  (iv) Finished Road top level 21.055 mt.
8. Structural Details
  (i) Foundation 1500 mm dia pile foundation
  (ii) Substructure R.C.C. Wall type solid piers
  (iii) Superstructure Pre-stressed "I" beam girder & Deck slab
  (iv) General Items POT-PTFE type bearing, Strip seal type Expansion joint & R.C.C. Retaining Wall
9. Name of Contractor Rajkamal Builders Infrastructure Pvt. Ltd., Ahmedabad.
10.  Name of Design Consultant Stup Consultants Pvt. Ltd., Navi Mumbai
11.  Name of Project management consultant S.N.Bhobe & Associates Pvt. Ltd, Navi Mumbai.
12.  Name of Third Party Inspecting agency Certifications Engineers International Ltd., Navi Mumbai.
13.  Name of Proof Consultant Sardar Vallabhbhai National Institute of Technology, Surat.