1.
|
Location
|
Road from Sumul Dairy to Ashwanikumar
|
2.
|
River/Nala/Creek
|
Approaches to Over Bridge on Railways (B.G.)
|
3.
|
Lane
|
Two lane
|
4.
|
Year of construction
|
1995-1997
|
5.
|
Cost
|
Rs.301.88 Lacs
|
6.
|
Details of Bridge
|
|
|
Length of Bridge approaches
|
850 mtr. Partly open span structures and partly closed retaining wall approach structures.
|
|
(ii) Number of span
|
37 Nos.
|
|
(iii) Span Length
|
14 mtr. c/c
|
|
(iv) Carriage Way
|
7.5 mtr.
|
|
(v) Length of Returns
|
Left side - 165 mtr. Right side - 165 mtr.
|
7.
|
(i)Design Discharge
|
N.A.
|
|
(ii) Design H.F.L.
|
N.A.
|
|
(iii) Type of bridge
|
Approach structures to Road Over bridge
|
|
(iv) F.R.L.
|
R.L. 11.37 mtr.
|
8.
|
Structural Details :
|
|
|
(i) Foundation.
|
Open foundation
|
|
(ii) Substructure
|
R.C.C. wall type pier and R.C.C. Abutments.
|
|
(iii) Superstructure
|
R.C.C. T beam and slab deck, simply supported over bearings.
|
|
(iv) General Items
|
R.C.C. M-200 precast parapet.
|
9.
|
Name of Contractor
|
M/s. Ranjit Construction Co., Mehsana
|
10.
|
Name of Consultant
|
Multi Media Consulting Engineers, Ahmedabad.
|