Construction of " Shri Sant Tukaram " Railway Over Bridge at L.C. No.143, Near Bhestan Railay Station.

01 | Location | : | ROB in lieu of lc no 143 at rly km 257/23-26 on Surat-Mumbai B.G. Railway line between station Udhana and Sachin at Surat |
02 | River/ Nala/ Creek | : | Railway Over Bridge |
03 | Lane | : | Three Lane |
04 | Year of Construction | : | Under Progress |
05 | Cost | : | Amount � 38,00,36,152=79 paisa |
06 | Details of Bridge | : | |
07 |
(i) Length of Bridge
(Between ends of Decking) |
: |
In SMC area - 911.60 mt. (including both and approaches) In Rly area - 68.40 mt. Total - 980.00 mt. |
(ii) Number of Span | : | 28 | |
(iii) Span Length | : |
25.00 X 11=275 mt. 23.250 X 3=69.75 mt. 23.200 X 10=232.00 mt. 21.150 X 1 =21.150 mt. 16.500 X 2 =33.000 mt. 37.200X 1= 37.200 mt. 31.200X 1= 31.200 mt. 8.121X 17= 138.057 mt. |
|
(iv) Width of Bridge | : |
In SMC area - 11.90mt. In Rly area - 15.50/15.80mt. |
|
(v) Length of R.C.C.
Approaches &Returns |
: | Towards Sania Kande village=142.65 | |
08 | (i) Design Discharge | : | -------- |
(ii) Design H.F.L. | : | -------- | |
(iii) Type of Bridge | : | Rly Over Bridge | |
(iv) F.R.L. | : | 23.010mt. | |
09 | Structural Details | ||
(i) Foundation | : | Pile Foundation | |
(ii) Substructure | : | R.C.C. Circular Pier & Pier Cap | |
(iii) Superstructure | : | Steel ' I ' Girder, Pre cast PSC ' I ' Girder & Deck slab. | |
(iv) General Items | : |
(1) Strip seal Expansion joint (2) Elastomeric Bearing (3) POT PTFE Bearing |
|
10 | Name of Contractor | : | Ranjit Buildcon Ltd,Ahmedabad |
11 | Name of Design Consultant | : | Multimedia Consultants Pvt. Ltd., Ahmedabad. |
12 | Name of Proof Check Consultant | : | SVNIT,Surat |
13 | Name of Project Management Consultant | : | Maimtura Consultants Pvt Ltd., Mumbai |