Construction of Fly OVer Bridge on Majura - Udhana junction on Ring Road , Surat


(A) General Details :- | ||||||
1. | Name of work | At Majura Gate Junction | At Kadiwala-Jail Gate Junction | At Udhana Gate Junction | From MajuraGate Income tax bhavan to Kadiwala junction (Upper level), branch fly over | |
2. | Cost | Rs. 572 Lacs | Rs. 1070 Lacs | Rs. 651 Lacs | Rs. 1000 Lacs | |
(B) Technical Details | ||||||
1. | Length of main bridge | 176.50 Mt | 347.50 Mt | 130.00 Mt | 860.0 Mt | |
Spans | 6 x 20.0 + 1x35.0 + 1x21.50 = 8.0 Nos. |
11x 20.0 + 2 x 25.0 + 1x18.5 + 1x21.50 + 2x12 + 1x13.5 = 18.0 Nos. |
4 x 20.0 + 2x 25.0 = 6.0 Nos. |
33 X 20.0+5 X 40.0 = 38.0 Nos. | ||
Nos. of Expansion jts. | 5 Nos. | 5 Nos. | 4 Nos. | 8 Nos. | ||
Length of approaches | 115.0 Mt Athwa side |
177.50 Mt Athwa side |
127.50 Mt Athwa side |
92.00 Mt Athwa side |
||
142.0 Mt Station side |
140.00 Mt Station side |
162.50 Mt Station side |
-- | |||
2. | Width of bridge | 17.10 Mt (4-lanes) | 20.60 (5-lanes) & 17.10 (4-lane) | 17.10 Mt (4-lanes) | 8.40 Mt (2-lanes) | |
3. | Year of Construction | Jan. - 2008 | Sept. - 2007 | Mar. - 2007 | May - 2008 | |
4. | Type of Foundation | Pile Foundation | ||||
5. | Sub structure | RCC designed Piers | ||||
6. | Super Structure | PSC pre cast I Girder, PSC Box girder, PSC solid Box & Deck slab | ||||
7. | Type of Bearing | Elastomeric Neoprene | ||||
8. | Type of Expansion joint | MODULAR / STRIP SEAL type | ||||
9. | Total Length of Bridges | 2465 mt. | ||||
10. | Total Project Cost | Rs. 3293 Lacs | ||||
11. | Name of Contractor | M/s. Ranjit Buildcon Co., Mehsana | ||||
12. | Design Consultant | Casad Consultant, Ahmedabad | ||||
13. | Name of Project Management Consultant | Sir Owen Williams Innovestment Limited, Noida. |