Construction of Fly OVer Bridge on Majura - Udhana junction on Ring Road , Surat

(A) General Details :-
1. Name of work At Majura Gate Junction At Kadiwala-Jail Gate Junction At Udhana Gate Junction From MajuraGate Income tax bhavan to Kadiwala junction (Upper level), branch fly over
2. Cost Rs. 572 Lacs Rs. 1070 Lacs Rs. 651 Lacs Rs. 1000 Lacs
(B) Technical Details
1. Length of main bridge 176.50 Mt 347.50 Mt 130.00 Mt 860.0 Mt
Spans 6 x 20.0 + 1x35.0 + 1x21.50
= 8.0 Nos.
11x 20.0 + 2 x 25.0 + 1x18.5 + 1x21.50 + 2x12 + 1x13.5
=  18.0 Nos.
4 x 20.0 + 2x 25.0
=  6.0 Nos.
33 X 20.0+5 X 40.0 = 38.0 Nos.
Nos. of Expansion jts. 5 Nos. 5 Nos. 4 Nos. 8 Nos.
Length of approaches 115.0 Mt
Athwa side
177.50 Mt
Athwa side
127.50 Mt
Athwa side
92.00 Mt
Athwa side
  142.0 Mt
Station side
140.00 Mt
Station side
162.50 Mt
Station side
--
2. Width of bridge 17.10 Mt (4-lanes) 20.60 (5-lanes) & 17.10 (4-lane) 17.10 Mt (4-lanes) 8.40 Mt (2-lanes)
3. Year of Construction Jan. - 2008 Sept. - 2007 Mar. - 2007 May - 2008
4. Type of Foundation Pile Foundation
5. Sub structure RCC designed Piers
6. Super Structure PSC pre cast I Girder, PSC Box girder, PSC solid Box & Deck  slab
7. Type of Bearing Elastomeric Neoprene
8. Type of Expansion joint MODULAR / STRIP SEAL type
9. Total Length of Bridges 2465 mt.
10. Total Project Cost Rs. 3293 Lacs
11. Name of Contractor M/s. Ranjit Buildcon Co., Mehsana
12. Design Consultant Casad Consultant, Ahmedabad
13. Name of Project Management Consultant Sir Owen Williams Innovestment Limited, Noida.