1.
|
Location
|
From Surat Navsari Road to Revanagar
|
2.
|
River/Nala/Creek
|
Kankara khadi
|
3.
|
Lane
|
Four lane
|
4.
|
Year of construction
|
1996-1997
|
5.
|
Cost
|
Rs.149.62 Lacs
|
6.
|
Details of Bridge
|
|
|
Length of Bridge
|
77 mtr.
|
|
(ii) Number of span
|
Seven
|
|
(iii) Span Length
|
11 mtr.
|
|
(iv) Carriage Way
|
2x7.5 mtr. + 1.20 mtr.wide footpath on both side each on two separate bridges.
|
|
(v) Length of Returns
|
Right side -10.25 mtr.
|
7.
|
(i)Design Discharge
|
1050 Cumecs
|
|
(ii) Design H.F.L.
|
R.L.6.40 mtr.
|
|
(iii) Type of bridge
|
Submersible bridge.
|
|
(iv) F.R.L.
|
R.L.(-)18.0 mtr. piers
|
|
|
R.L.14.00 mtr.abutments
|
8.
|
Structural Details :
|
|
|
(i) Foundation.
|
R.C.C. bored cast in situ piles 1200 mm dia 23.00 deep.
|
|
(ii) Substructure
|
R.C.C. piles extended to directly suport deck.
|
|
(iii) Superstructure
|
R.C.C. solid slab deck simply supported on elastomeric bearings.
|
|
(iv) General Items
|
Post and pipe rails. The bridge also has provision for carrying 2 Nos. 1000 mm dia
water supply mains.
|
9.
|
Name of Contractor
|
M/s. Sona Builders, Surat.
|
10.
|
Name of Consultant
|
Multi Media Consulting Engineers, Ahmedabad.
|